LUAS TRAM STOP AT THE POINT
On Tuesday, 8 December 2009 the Red Line C1 Connolly to Docklands extension opened. There are four stops: George’s Dock, Mayor Square-NCI, Spencer Dock (serving the new Docklands railway station, approximately 350 metres (1,150 ft) away) and terminating in Point Village, opposite the 3Arena, this extension however bypasses Connolly. Construction started at the beginning of June 2007. Test runs began on the line in September 2009 before the opening.
You must be logged in to post a comment.