THIS IS KNOWN AS THE LIVING BRIDGE AND IT FEATURES FOUR PLATFORMS OF REFUGE
This visit I tried my best to photograph all the bridges in Limerick, especially those that I had not photographed before. I should mention that I have visited and photographed the “Living Bridge” a number of times but this time I managed to get some new views of the structure.
“The Living Bridge – An Droichead Beo” is a unique design by Wilkinson Eyre Architects, London and consists of seven 50-metre spans linked together by piers which create four platforms of refuge for walkers.
The platforms are designed to accommodate social gatherings, informal teaching sessions, music and dance performances, as well as a wide array of educational, social and cultural activities – all contributing to this facility’s status as a “living” bridge”.
The bridge alternates between rhythms of bridge and island, with lightweight bridge structures joining to more solid pier locations. This is reflected by the change in construction materials from steel to concrete and the transition from open parapets to solid pillars and glazed side walls which serve to shelter the “inhabitants” of this animated facility.
The architects designed the bridge to move in a beautiful flowing line across the Shannon, mirroring the river. The design conveys the sense of a series of bridges leaping from pier to pier, each supported by one of the existing islands in the riverbed. This gives the traveller the sense that they are crossing the river on stepping stones.
From the south campus, access to the bridge is through what presents itself as a hidden gateway in the Millstream Courtyard and provides a vital link between the Glucksman Library, Concert Hall and Millstream developments to the Health Sciences and the new Irish World Academy of Music and Dance on the north bank. An impressive Plaza will welcome you to Clare once you have travelled over the bridge.
The Pedestrian Living Bridge project was resourced through a partnership of private and public funding and was assigned to Arup Consulting Engineers in Dublin. Kerin Contract Management in Limerick managed the project while building work was undertaken by Eiffel Construction, France’s largest bridge builder.
The area still smells at times and maybe it is because I am not a local that I can notice the smell well away from the river. But to be fair the river Liffey was much worse about twenty years ago [not sure why it has improved]
The Lagan Weir, in Belfast, crosses the River Lagan between the Queen Elizabeth Bridge and the M3 cross-harbour bridge. Prior to the building of the weir, the river would be subject to tidal fluctuations, and low tide would expose mudflats, which were unsightly and emitted a strong odour, particularly in the summer months. Opened in 1994, the weir was seen by the Laganside Corporation as a catalyst for its redevelopment projects and was judged to be the “centrepiece” of that effort. The weir also incorporates a footbridge.
A pedestrian bridge was constructed over the weir and connects Donegall Quay with Queen’s Quay. The original bridge, which was narrow and required spiral access ramps at either end, was located above the weir gates and supported by the weir gatehouse structures. This was removed in 2014 to allow the construction a new structure, which provides access for both cyclists and pedestrians. The new bridge was erected by Graham Construction at a cost of £5m and is approximately 8 meters wide at its widest point. I like the new bridge.